• 22+ GW

    of power

    /media/20157/acwapower_header-power_homepage.gif
  • 2.7 million M3 day

    of desalinated water

    /media/20156/acwapower_header-water_homepage.gif

Project

SHARE THIS

Shuaibah Expansion II IWP

The Shuaibah-3 Expansion II Project is a 250,000 m3 per day SWRO desalination plant next to our existing Shuaibah-3 IWPP and Shuaibah-3 Expansion IWP projects in Shuaibah. The project is currently owned 100% by ACWA Power, and is scheduled to be commissioned by H1 2019. 

KEY FACTS

  • LOCATION
    Saudi Arabia
  • DESALINATED WATER
    250,000 m3/day
  • CONFIGURATION
    Conventional
  • PROJECT COST
    USD 325 Mn
  • ACWA POWER EFFECTIVE SHARE
    100%
  • OFFTAKE CONTRACT
    WPA-BOO-25 YR