Bash Wind IPP

OVERVIEW

The Bash 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.

ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.

The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.

 

ESIA NTS – English Russian Uzbek
ESIA Volume 2 Main Report – English Russian
ESIA Volume 3 ESMMP – English Russian
• ESIA Volume 4 Appendices: Part A, Part B, Part C – English
SEP – English Russian

RAP – English Russian Uzbek
ESAP – English Russian

 

KEY FACTS

  • LOCATION
    Bash, Bukhara Region, Uzbekistan
  • OFFTAKER
    JSC National Electric Grid of Uzbekistan (NEGU)
  • CAPACITY
    500 MW
  • TECHNOLOGY
    Onshore Wind
  • PROJECT COST
    USD 630 Mn
  • ACWA POWER SHARE
    100%
  • OFFTAKE CONTRACT
    25-year PPA BOO(T)
  • PROJECT COMPANY
    FE “ACWA Power Bash Wind” LLC
  • O&M
    NOMAC
  • COMMERCIAL OPERATIONAL DATE
    Q3 2024