HSSE Management

During the feasibility assessment and development or acquisition phases for new assets, HSSE issues are identified and managed by undertaking HSSE due diligence assessments and then commissioning environmental & social impact assessments (ESIA) that are completed by independent consultants.

Asset performance-related and technical issues with HSSE consequences are covered by ACWA Power’s minimum technical specifications which are applied to all projects and are based on ensuring compliance with local legislation and the WB/IFC EHS Guidelines.

At the start of construction, project-specific HSSE and social action plans are established as part of the implementation of the ESIA which is also a contractual obligation. ESIA compliance is monitored by both the project company’s and the corporate HSSE teams, who are supported by independent environmental consultants that conduct audits on the lenders’ behalf.

HSSE Management

At an operational level, NOMAC has an integrated management system that covers HSSE and has been certified to the ISO and OHSAS standards since 2010. We perform an annual occupational health check-up for at risk operational employees covering a range of parameters, including lung tests and audio tests. All construction sites have access to on-site nurses and doctors, with remote sites having on-site ambulances and emergency response resources.

ACWA Power offers rewards programs to motivate stakeholders to abide by the company’s HSSE policies. They include recognition, bonuses and cash incentives for good performance and rewarding reporting of near-misses. We believe that incentives combined with a zero-tolerance enforcement of standards are instrumental in driving HSSE in action and fostering a safety culture across all of ACWA Power.

 

Emergency and critical health and safety incidents are reported through agreed channels within four hours to enable the deployment of formal emergency response plans. All incidents are followed up through formal investigations to identify root causes and lessons learned, the outcomes of which are shared. Incidents and noncompliance events are reported monthly and collated for publication in ACWA Power’s annual corporate report. We conduct periodic management and performance audits which are followed by a detailed report of findings, conclusions and recommendations. These are then monitored and tracked until closure.

Please click here to read ACWA Power's Health, Safety, Security, Environment (HSSE) Policy Statement.

ENVIRONMENTAL & SOCIAL

impact studies

Al Dur2 IWPP ESIA Disclosure Package
  • Environmental & Social Impact Assessment, Volume 1 (English) pdf
  • Environmental and Social Impact Assessment Volume 2 (English) pdf
  • Environmental & Social Impact Assessment Volume 3 (English) pdf
  • Environmental and Social Impact Assessment Volume 4 (English) pdf
Al Kahfah PV IPP ESIA Disclosure Package
Al Khushaybi PV IPP
Al Mowyah PV IPP
Al Taweelah IWP ESIA Disclosure Package
  • Environmental & Social Impact Assessment, Volume 1 (English) pdf
  • Environmental and Social Impact Assessment Volume 2 (English) pdf
  • Environmental & Social Impact Assessment Volume 3 (English) pdf 
  • Environmental and Social Impact Assessment Volume 4 (English) pdf
  • Non-Technical Summary (Arabic) pdf
  • Stakeholder Engagement Plan (English)  pdf
Ar Rass PV IPP ESIA Disclosure Package
  • Environmental & Social Impact Assessment (English) pdf
Ar Rass 2 PV IPP ESIA Disclosure Package
Azerbaijan Wind IPP ESIA Disclosure Package

 

Area 1:

Khizi 3:

Bash Wind IPP ESIA Disclosure Package
DEWA V PV ESIA Disclosure Package
  • Stakeholder Engagement Plan (English)pdf
  • DEWA Mohammed Bin Rashid Al Maktoum Solar Park – Phase V Environmental & Social Impact Assessment Vol 1: Non-Technical Summary (English)pdf
  • DEWA Mohammed Bin Rashid Al Maktoum Solar Park – Phase V Environmental & Social Impact Assessment Vol 2: Main Text, Tables & Figures (English)pdf
  • DEWA Mohammed Bin Rashid Al Maktoum Solar Park – Phase V Environmental & Social Impact Assessment Vol 3: Framework for Environmental & Social Management (English)pdf
  • DEWA Mohammed Bin Rashid Al Maktoum Solar Park – Phase V Environmental & Social Impact Assessment Vol 4: Appendices (English)pdf
Dzhankeldy Wind IPP ESIA Disclosure Package
Haden PV IPP
Hassyan IWP ESIA Disclosure Package
  • Environmental & Social Impact Assessment (English) pdf
Ibri 2 IPP ESIA Disclosure Package
  • Ibri II Solar PV Power Plant - Construction monitoring report Non-technical summary (1st Quarter 2020) (English)pdf

  • Ibri II Resettlement Action Plan (English)pdf
  • Ibri II Stakeholder Engagement Plan (English)pdf
JAZAN IGCC ESIA Disclosure Package
  • Environmental and Social Impact Assesement Volume 1 - Non-Technical Summary (English) (Arabic)pdf
Khalladi Wind IPP ESIA Disclosure Package
Environmental Impact Assessment (EIA)

Hard copies of the Khalladi Wind Farm ESIA Disclosure Package and Khalladi Environmental Impage Assessment are also available at the “bureau d’ordres” at the following municipalities: 

Qsar Sghir: Commune Ksar Sghir, Préfecture Fahs Anjra, Wilaya de Tanger. 
Meloussa: Commune Meloussa, Préfecture Fahs Anjra, Wilaya de Tanger. 
Khmis Anjra: Commune Fahs ANJRA, Préfecture Fahs Anjra, Wilaya de Tanger. 
Souk Kdim: Commune Souk Kdim, Province Tetouan 
Sadina: Commune Sadina, Province Tetouan

Kirikkale CCGT IPP Project and its Over Head Transmission Line
Kom Ombo PV IPP ESIA Disclosure Package
  • Environmental & Social Impact Assessment, Volume 2 (Arabic) pdf
  • Stakeholder Engagement Plan (English) (Arabic)  pdf
  • Environmental & Social Impact Assessment: Non-Technical Summary (English) (Arabic) pdf
  • Environmental & Social Impact Assessment Volume 2: Main Text (English) pdf
  • Environmental & Social Impact Assessment Volume 3: Framework for Environmental and Social Management (Contractors Management Plan) (English) pdf
  • Environmental & Social Impact Assessment Volume 4: Appendices (English) pdf
  • Kom Ombo PV IPP Appendices (English) pdf
Layla PV IPP ESIA Disclosure Package
  • Layla PV IPP Environmental & Social Impact Assessment (Englishpdf
MAFRAQ PV IPP ESIA Disclosure Package
NOOR Ouarzazate IV
NOOR Boujdour Site & Corridor SESIA
NOOR Laayoune Site & Corridor SESIA
Specific Environmental and Social Impact Assessment (SESIA) for the NOORo II and the NOORo III projects
Rabigh 4 IWP ESIA Disclosure Package
  • Non-Technical summary ESIA report pdf
Risha PV IPP ESIA Disclosure Package
Saad 2 PV IPP ESIA Disclosure Package
  • Saad 2 PV IPP Environmental & Social Impact Assessment (English) pdf
  • ESIA Addendum (English)pdf
Sakaka PV IPP ESIA Disclosure Package
  • Sakaka PV IPP Environmental & Social Impact Assessment (English) pdf
Salalah IWP ESIA Disclosure Package
  • Environmental & Social Impact Assessment, Volume 1: Non Technical Summary (NTS) (English) pdf
  • Environmental and Social Impact Assessment Volume 2 (Main Text, Tables & Figures) (English) pdf 
  • Environmental & Social Impact Assessment Volume 3: (Framework Environmental & Social Management Plan (ESMP)) (English) pdf
  • Environmental and Social Impact Assessment Volume 4 (Appendices) (English) pdf
Shuaa 1

Environmental & Social Impact Assessment (English) pdf

Shuaibah PV IPP ESIA Disclosure Package
    • Environmental & Social Impact Assessment– (English) pdf

 

Sirdarya CCGT ESIA Disclosure Package
Sudair PV IPP ESIA Disclosure Package
  • Environmental & Social Impact Assessment (English) pdf
Umm Al Quwain IWP ESIA Disclosure Package
  • UAQ 150 MIGD Environmental Approval (English) (Arabic) pdf
  • Environmental & Social Impact Assessment Volume 1: Non-Technical Summary (English) (Arabic) pdf
  • Environmental and Social Impact Assessment Volume 2: Main Text (English) pdf
  • Environmental & Social Impact Assessment Volume 3: Environmental & Social Management (English) pdf
  • Environmental and Social Impact Assessment Volume 4: Appendices (English) pdf
  • Stakeholder Engagement Plan (English) pdf
Uzbekistan first integrated GH2 ESIA Disclosure Package